Project independent acceptance publicity

Your current location: Home >> News >> Company news

Project independent acceptance publicity

Date of release:2020-10-01 Author: Click:

Weihai guheng construction machinery co., LTD


Completion of environmental protection acceptance comments


On November 25, 2018, weihai fixed constant construction machinery co., LTD., according to the mechanical processing and manufacturing project completion environmental protection acceptance monitoring report and "interim measures for construction project completion environmental protection acceptance", in accordance with the relevant state laws and regulations, construction project completion environmental protection acceptance specification, this project environmental impact assessment report and management department for examination and approval opinions for acceptance to this project. The inspection team and the representatives visited the site, listened to the report of the construction unit on the implementation of the project construction and environmental protection, and the acceptance report prepared by the acceptance report. After careful discussion, the acceptance Suggestions were put forward as follows:


I. basic information of project construction


(1) location, scale and main contents of the construction


Weihai guheng construction machinery co., LTD. Machinery processing and manufacturing project is located in the south of shop zhongxin street, gejia town, wendeng district, weihai city, mainly engaged in the production and operation of tower cranes, construction lifts and other machinery. The project covers an area of 35878m2 and a building area of 12371.75m2. The main buildings include machining workshop, structure welding workshop, painting drying workshop, office building, etc. The main products of the project are QTZ tower crane and SC construction hoist and other machinery. The design and production scale of eia is 35 sets /a and 15 sets /a respectively, with a total of 50 sets /a. The actual production scale is 30 sets /a and 10 sets /a, and 40 sets /a in total.


(2) construction process and environmental protection approval


Weihai fixed constant construction machinery co., LTD., in June 2018 to entrust weihai city environmental protection science research institute co., LTD., compiled the "weihai fixed constant construction machinery co., LTD. Mechanical processing and manufacturing project environmental impact report", weihai tangerang district environmental protection bureau on July 18, 2018 shall be the examination and approval, the examination and approval document number: Wen Huan review table (2018) 7 to 19. The project started construction in January 1993 and was debugged in August 2018. Because the project has been built and put into production without the eia document approved by the environmental protection department, the environmental protection department has imposed administrative punishment on the project according to law.


(3) investment status


The total investment of the project is 2 million yuan, funded by weihai guheng construction machinery co., LTD. Of this, 150,000 yuan was invested in environmental protection, accounting for 7.5% of the total investment.


(4) acceptance scope


The scope of this acceptance is the whole machining and manufacturing project.


Construction of environmental protection facilities


(1) waste water


The main waste water in the project operation period is the domestic sewage of the staff. The main pollutants in the sewage are COD, nh3-n, etc. After the septic tank pretreatment, the sewage is transported by tank truck to the weihai liansheng cleaning services co., LTD. Fermentation tank for treatment, after which the local farmers transport compost without external discharge.


(2) exhaust gas


The exhaust gas of the project is mainly rust-removing dust, cutting dust, welding dust and painting dust.


A small amount of dust from manual derusting, a small amount of smoke and dust from steel cutting and preparation, and smoke and dust from welding process are all discharged without organization through the ventilation and ventilation facilities in the workshop.


All the spray painting work is carried out in the spray room. The spray painting room adopts airtight spray painting operation. The paint mist and organic waste gas generated by the spray painting and drying are treated by the "dry filter cotton + activated carbon adsorption + photooxygen catalysis" device and discharged by a 15m high exhaust cylinder after reaching the standard.


(3) noise


Project noise mainly comes from all kinds of production equipment such as lathe, milling machine, planer, shearing machine, punching machine, welding machine and fan, etc. The equipment noise source is about 85~100dB(A). Low noise equipment is selected. On the basis of reasonable layout, the project boundary noise can meet the corresponding standard requirements after the foundation shock absorption, wall barrier and distance attenuation are adopted for the equipment.


Solid waste


The solid waste generated during the operation of the project mainly includes domestic waste, general industrial solid waste and hazardous waste.


(1) household garbage


After the classified collection of household garbage, it will be collected by the sanitation department and transported to the waste treatment site in wendeng district for treatment, with basically no impact on the surrounding environment.


(2) general industrial solid waste


General industrial solid waste mainly includes metal surface impurities and oxide layer, metal scraps, welding slag, etc.


Metal scraps and welding slag are sold to waste recycling companies for comprehensive utilization; The impurities and oxide layer on the metal surface are collected by the sanitation department and transported to the waste disposal site in wendeng district for harmless treatment.


(3) hazardous waste


Hazardous wastes mainly include paint residue, waste oil, waste cutting fluid, waste oil rags, waste containers, waste filtration materials, etc.


According to the national hazardous waste directory, paint residue waste category is "HW12 dye, paint waste", waste code 900-252-12; The waste oil waste category is "HW08 waste mineral oil and mineral oil waste", waste code 900-217-08; The waste cutting fluid waste category is "HW09 oil/water, hydrocarbon/water mixture or emulsion", waste code 900-006-09; Waste containers and waste filtration materials (waste filtration cotton, waste activated carbon, etc.) are classified as "HW49 other wastes". The waste code is 900-041-49.


The waste oil rags are included in the list of hazardous waste exemption management. The whole process is not according to hazardous waste management, and can be treated together with household garbage.


(5) other environmental protection facilities


1. Environmental risk prevention facilities


(1) sewage pipe seepage prevention


HDPE pipe was installed in the domestic sewage pipeline of the project. When laying the pipe, the pipe pit was backfilled with clay and tamped down, and anti-seepage treatment was carried out. Septic tank are used cement hardening, and seepage treatment.


(2) the paint warehouse and other raw materials are hardened to prevent seepage, rain and leaching.


(3) the company has established the general manager responsibility system, the general manager responsible for first, office and production for daily office environment and safety management and emergency rescue, established varnished liquid materials such as leakage, bums and related safety emergency treatment, next to each worker to learn and master project established environmental management system and the emergency response plan, and regularly carry out emergency drills and summarizes the result of the exercise.


(4) the project has built a temporary storage site for hazardous waste, and all the hazardous waste is temporarily stored in the hazardous waste warehouse. The ground has been impermeable and leakage-proof, and there is an emergency temporary storage bucket.


2. Investment in environmental protection facilities and implementation of the "three simultaneous projects"


The total investment of the project is 2 million yuan, of which 150,000 yuan is invested in environmental protection, accounting for about 7.5% of the total investment. Environmental protection investment is mainly used for waste gas treatment, noise treatment, sewage treatment, solid waste disposal. The project has completed the examination and approval procedures for environmental impact in accordance with the national environmental management regulations on construction projects, and the construction of environmental protection facilities has been carried out according to the requirements. The supporting environmental protection facilities and the main project are designed, constructed and put into use at the same time.


Iii. Inspection and inspection results


(1) discharge of pollutants up to the standards


During the monitoring period, the project was in normal operation with the operating load of each major facility above 75%. The monitoring results of the project are as follows:


1. The sewage


There is no production waste water in the project, all of which are domestic sewage. The main pollutants are COD, ammonia and nitrogen, etc., and the water quality is relatively simple. After the pretreatment of septic tank, the sewage is transported by tank truck to the fermentation tank of weihai liansheng cleaning service co., LTD., for treatment. Therefore, the waste water was not monitored during the project acceptance.


2. The waste gas


During the acceptance monitoring period, the maximum VOCs emission concentration in the organized exhaust gas was 0.334mg/m3, and the maximum emission rate was 1.07×10-3kg/h. Xylene was not detected, which could meet the standard requirements of table 2 of volatile organic compounds emission standard -- part 5: surface coating industry (db37/2801.5-2018) (xylene was 15mg/m3, 0.8kg/h). VOCs 70mg/m3, 2.4kg/h). At the monitoring point of the boundary of the unorganized emission plant, the maximum concentration of particulate matter was 0.362mg/m3, the maximum concentration of xylene was 0.0015mg/m3 and the maximum concentration of VOCs was 0.021mg/m3. Thus it can be seen that the concentration of particulate matter at the factory limit can meet the requirements of table 2 of the comprehensive emission standard of air pollutants (gb16297-1996) (1.0mg/m3). Xylene and VOCs plant boundary concentration can meet the requirements of table 3 of volatile organic compounds emission standard - part 5: surface coating industry (db37/2801.5-2018) (xylene 0.2mg/m3; VOCs 2.0 mg/m3).


3. The noise


During the acceptance monitoring period, the noise value of the project factory boundary is between 51.2~57.1dB(A) in the day and 43.4~47.4dB(A) at night. The monitoring values of the factory boundary noise all meet the requirements of the two types of environmental noise emission standards of industrial enterprise factory boundary (gb12348-2008).


4. Solid waste


The household garbage generated by the project will be collected centrally, cleaned and transported regularly by the sanitation department, and sent to the garbage treatment site for reasonable disposal. General industrial solid waste recycling, hazardous waste by qualified departments. Solid waste disposal is reasonable, to the surrounding environment to achieve zero emissions.


Iv. Total volume control


There is no total index of sulfur dioxide and nitrogen oxide. Domestic sewage into the septic tank after the pretreatment by weihai liansheng cleaning services co., LTD. With tank truck regular transport, unified treatment, not outside the discharge, so there is no need to apply for total index.


V. conclusion of acceptance inspection


The project implemented the "three simultaneous" environmental protection system and implemented pollution prevention and control measures. According to the monitoring results of on-site inspection and completion environmental protection acceptance inspection, the project meets the requirements of environmental assessment and approval, and the acceptance team agrees that the project shall pass the completion environmental protection acceptance inspection.


Six, advice,


1. Strengthen the daily maintenance of machinery and equipment, and make reasonable layout to minimize the impact of noise pollution on the surrounding residents.


2. Strengthen the management and maintenance of waste gas treatment facilities to ensure the stable emission of waste gas to standards and reduce air pollution.


3. Strengthen the standard management of hazardous wastes and temporary storage sites, and dispose of them regularly by qualified units to reduce solid waste pollution.


4. Outdoor welding and painting are prohibited to reduce environmental pollution.


5. Check sensitive points regularly to ensure compliance.


Project acceptance group


November 25, 2018


Publicity period: December 1, 2018 - December 21, 2018 (20 working days)


Contact number: 13181873288


Public website: http://www.treeoftheworld.com


Location: weihai guheng construction machinery co., LTD


The address of this article:http://www.treeoftheworld.com/en/news/396.html

Key word:

Recently browse:

Related products:

Related news:

Free consultation hotline

86-631-8844968


Mobile web siteWeChat public number

Contact

Weihai guheng construction machinery co. LTD

Address: puji, weihai city, shandong province

Sales hotline: 13863153685 (general manager wang)

Sales hotline: 86-631-8844968

Fax: 86-631-8846789

QQ: 513079487

E-mail:573079487@qq.com

Website: www.treeoftheworld.com